ATC: Checking Parallel Processing Capacity for Central Check Runs

A long-running central ATC check does not necessarily need more processes. Check whether the run is waiting for execution capacity, RFC communication or expensive individual checks.

What to check

In ATC, inspect the run series, execution status and check variant. In SM37, locate the dispatcher job and review its log. Use SM50 or SM66 to check work process utilization while the run is active. Verify the RFC connection to the checked system and inspect available resources on both sides.

Validation and precautions

Review the release-specific CCM/ATC configuration for supported parallelization options. Do not guess a process parameter or increase it globally without checking spare dialog capacity and database load. Compare elapsed time and system impact with the same representative object set after an approved adjustment.

Reference

SAP Note: 3774742

SAP Help: Documentation