
For planned maintenance of a Cloud Connector master in an HA pair, move the active role to the healthy shadow before taking the original master offline. SAP documents this role-switch approach as part of its rolling upgrade procedure.
Procedure
Check that the shadow is connected and synchronized. In the current master’s administration UI, use Switch Roles. Confirm that the former shadow is now master and that the required subaccount tunnels are working. Only then stop the former master, perform the approved maintenance and start it again.
Wait for the restarted node to rejoin as shadow. Test the application connection through the active master. Switch roles again only if you need to restore the original node assignment.
Upgrade-specific restriction
SAP documents additional HA reset and reconnection requirements for rolling upgrades from releases before 2.13 to 2.13 or later. If the maintenance includes a version upgrade, use the exact upgrade procedure for the starting and target versions. Take a configuration backup first.
The rolling upgrade documentation supports the role-switch principle; a specific incident or restart scenario may require additional validation. Avoid taking both nodes offline together.
Reference
SAP Help: Upgrade — Avoid Connectivity Downtime.
SAP Note (related): 3772326.


