During a database migration with SUM DMO, phase HDB_MIGCONFIG collects information needed for the target HANA database. The database must be ready for the supported migration procedure before SUM reaches this step.
Pre-checks
- Confirm target HANA revision and platform support against the applicable SUM guide, PAM and relevant SAP Notes.
- Prepare the target database or tenant, including required sizing, storage capacity, database connectivity and the prescribed database users.
- Verify connectivity from the actual SUM host and make the required database client installation files available.
- Confirm the intended target schema and other migration-specific values with the Basis and database teams.
During HDB_MIGCONFIG
Enter the connection and schema information requested by your SUM version. Do not assume that the schema name is identical for every source release or migration scenario. If the phase stops, inspect the SUM error and relevant logs before changing the database configuration.
Maintain a validated source backup and follow SUM’s documented reset or recovery rules. Do not remove an existing target schema or restart the migration outside the supported procedure.
SAP Help: Preparing Target Database SAP HANA
SAP Help: Configuration